Compact Industrial Steam Boilers | CERTUSS Junior TC

Small steam generator for gas and oil firing

Junior TC

Small steam boiler, big advantages

Heating Capacity
5.4 - 27.3 BHP
Combustion
Oil / gas
Heating time
3 minutes
Efficiency
~ 87%

The compact Junior TC with direct power adjustment

  • Full steam output just 3 minutes after cold start
  • Up to 27.3 BHP heating capacity with a single JUNIOR TC
  • Up to 3,527 lbs/h steam capacity as a multiple system
  • The burner reacts in real time to the actual steam requirement - from low load to peak load
  • Multiple system, a real alternative to individual large steam boilers with high steam output
  • Extremely space-saving
  • Triple air insulation with energy-efficient preheating of the combustion air
  • High efficiency (98%) with exhaust gas heat exchanger
  • Very economical with fluctuating steam demand
Multiple system consisting of two JUNIOR TC - incl. CVE supply unit

The advantages of the small steam boiler

Efficient & economical

Emission losses remain low thanks to 3-fold air insulation and effective heat recycling with simultaneous preheating of the combustion air.

Safe and space-saving

At the steam output generated, and thanks to its vertical design, the JUNIOR TC steam generator can and may be operated in working areas.

No permit required

The water tube boiler principle guarantees high operational reliability. 3-fold air insulation eliminates the need for insulation material completely

Junior TC - Steam generators for gas / oil

Size I Size II Size III
Steam Capacity 176 - 265 lbs/h 331 - 441 lbs/h 551 - 882 lbs/h
Heating Capacity 5.4 - 8.2 BHP 10.2 - 13.6 BHP 17 - 27.3 BHP
Output Gross 181 - 273 MBTU/h 341 - 454 MBTU/h 570 - 914 MBTU/h
Height / Width / Depth 60 / 29 / 51 in 63 / 30 / 58 in 73 / 34 / 62 in
Min. / Max. Operating Pressure 80 / 120 - 420 psi 80 / 120 - 420 psi 80 / 120 - 420 psi
Max. Perm. Overpressure 150 - 460 psi 150 - 460 psi 150 - 460 psi

Our boiler is already steaming here

Yards Brewing Co

The equipment would need to supply a min. of 100,000 barrels/year facility, with a fuel supply of natural gas and steam production requirement of 16 hours a day, 5 days a week. The complete equipment is in a line, with space allotted for the third generator. The steam produced serves all applications, out of which approx.80% is consumed in the brewhouse and the rest almost equally shared between cold-block CIP and the keg line.

Interested in CERTUSS Steam?

Get connected with one of our local consultants and engineers to discuss your Steam project!